  1. The Stream Edge UPS Sprinkler Power Protection

    Installing a standby power solution to the fire life safety systems at The Stream Edge has provided the residents with additional back up to their existing fire protection. UPS Sprinkler Power Protection

     

    Read more »
  2. Walsall Council Data Centre Power Upgrade

    Upgrading the obsolete UPS (Uninterruptible Power Supply) System within the Walsall Council data centre and provisioning a new standby generator for the entire White Space has not only reinstated reliability, but dramatically improved the efficiency of the whole system. Uninterrupitble Power Supply and AKSA Generator Upgrade

     

    Read more »
  3. Together Housing Group Data Centre Move - Week 7

    You can download the whole case study as a PDF here.

    Previously: -

    The generator plinth had been completed and the air-conditioning units were installed. Everything was ready for the final stage.

    You can read about Week 5/6 here.

    Week 7: -

    Week 7 started with the
    Read more »
  4. Together Housing Group Data Centre Move - Week 5/6

    You can download a PDF version here.

    Previously: -

    In Week 4 the fire suppression installation had begun, a trench was dug for the generator cabling and the area for the generator plinth was cleared.

    You can read about Week 4 here.

    Week 5: -

    During Week 5 the focus h
    Read more »
  5. Together Housing Group Data Centre Move - Week 4

    You can download a PDF version here.

    Previously: -

    In Week 3 we were waiting for the main contractor to finish the work on the building. This consisted of putting the communication cables in before finishing the floor and completing the decorating.

    You can read about Week 2/3 here.

    Week 4: -

    Read more »
  6. Together Housing Group Data Centre Move - Week 2/3

    You can download a PDF version here.

    Completed sockets

    Previously: -

    Together Housing Groupselected UPS Systems to move their existing data centre from Halifax to Wakefield. The initial work in Week 1 was going to plan until extreme weather conditions caused a few delays.

    You can read about Week 1 here.

    Week 2: -

    The second week of the project, commencing 5th March 2018, b

    Read more »
  7. Together Housing Group Data Centre Move - Week 1

    You can download a PDF version here.

    About: -

    High and Low Level Tray workTogether Housing Group are one of the biggest housing associations in the North of England with over 38,000 homes mainly across the Yorkshire and Lancashire areas. Together Housing is a non-profit making organisation and any money they make is invested back into the association for the benefit of our residents and local communities. As well as houses to rent, they also build and manage homes for sale, sheltered accommodation and extra care. You can find more about Together Housing Group here.

    Challenge: -

    Together Housing Group requested that UPS Systems plc move their existing

    Read more »