Case Studies

  1. Walsall Council Data Centre Power Upgrade

    Upgrading the obsolete UPS (Uninterruptible Power Supply) System within the Walsall Council data centre and provisioning a new standby generator for the entire White Space has not only reinstated reliability, but dramatically improved the efficiency of the whole system. Uninterrupitble Power Supply and AKSA Generator Upgrade

     

    Read more »
  2. The Stream Edge UPS Sprinkler Power Protection

    Installing a standby power solution to the fire life safety systems at The Stream Edge has provided the residents with additional back up to their existing fire protection. UPS Sprinkler Power Protection

     

    Read more »
  3. Grantham House UPS Protection for Passenger Lift

    Installing a standby power solution to the passenger lift at Grantham House has provided the system with a reliable source of power. This will ensure that the lift is always able to return to the ground floor in the event of a fire or a mains failure. UPS Protection for Lift

     

    Read more »
  4. Tower Block Fire Safety

    A standby power solution was installed in four tower blocks to keep the sprinkler system running and enhance their fire protection. Uninterruptible Power Supply

     

    Read more »
  5. Ocado Group UPS System Replacement

    Ocado took full occupation of their new Trident Place Head offices in March 2007, an estate they took over from a major telecoms provider. Within the new offices, Ocado inherited existing Data Centre space from a legacy operation. This Data Centre was protected by an old UPS (Uninterruptible Power Supply) system which was highly inefficient. Uninterruptible Power Supply

     

    Read more »
  6. MIL Collections UPS Systems Installation

    MIL Collections recently decided to protect their offices from power outage. The data stored at MIL Collections is very important as it relates to debt. It is a requirement to protect (or restore) this kind of data from corruption under GDPR. Sudden shutting down of servers from a power outage can cause this kind of corruption. UPS Uninterruptible Power Supply

     

    Read more »
  7. Together Housing Group Data Centre Move - Week 7

    You can download the whole case study

    Read more »
  8. Together Housing Group Data Centre Move - Week 5/6

    You can download a PDF

    Read more »
  9. Together Housing Group Data Centre Move - Week 4

    You can download a PDF

    Read more »
  10. Together Housing Group Data Centre Move - Week 2/3

    You can download a PDF version here.

    Read more »
To Top