Case Studies
-
Posted: February 27, 2024Categories: Case Studies
Kings College reached out to us at UPS Systems for a backup power solution to provide a layer of protection for two emergency lifts. The lift motors were critical for the daily functioning of the campus, requiring continuous power to both lift motors to ensure everyone could evacuate the building in case of a power failure.
-
Posted: September 04, 2023Categories: Case Studies
A Mechanical, Electrical and Maintenance facility reached out to us with a specific requirement for a UPS system. This facility needed a reliable UPS system to support a continuous load of 12.24 amps per phase. Additionally, their load had a start-up current of 89.15 amps.
-
Posted: August 17, 2023Categories: Case Studies
Upperton Pharma Solutions is a Pharmaceutical Contract Development and Manufacturing Organisation which produces critical medicines. They contacted UPS Systems PLC with a requirement for a UPS that would support their Air Handling Unit in its HVAC (heating, ventilation, and air conditioning) system.
-
Posted: August 01, 2023Categories: Case Studies
Geo data specialist company in Oxfordshire contacted UPS Systems PLC to replace the existing UPS system supporting the IT infrastructure within the building. The IT facilities required an up to date protection solution to ensure that the system remains operational should the building experience a power outage.
-
Posted: February 20, 2023Categories: Case Studies
A smoke ventilation company contacted UPS Systems plc to provide a power protection solution for the life saving smoke ventilation system being installed in the apartment building near Hyde park. The smoke ventilation system requires a power protection solution to ensure that the system remains operational should the building experience a power outage during an emergency situation.
-
Posted: May 17, 2022
A Sound Engineering Company gave us a call one day with a requirement for a rack mountable UPS System that needed to support a 10Kva load for the duration of 6 hours for backup power for audio amplifiers. -
Posted: March 09, 2020
MIL Collections recently decided to protect their offices from power outage. The data stored at MIL Collections is very important as it relates to debt. It is a requirement to protect (or restore) this kind of data from corruption under GDPR. Sudden shutting down of servers from a power outage can cause this kind of corruption. -
Posted: March 09, 2020
Ocado took full occupation of their new Trident Place Head offices in March 2007, an estate they took over from a major telecoms provider. Within the new offices, Ocado inherited existing Data Centre space from a legacy operation. This Data Centre was protected by an old UPS (Uninterruptible Power Supply) system which was highly inefficient. -
Posted: March 09, 2020
A standby power solution was installed in four tower blocks to keep the sprinkler system running and enhance their fire protection. -
Posted: March 09, 2020
Installing a standby power solution to the passenger lift at Grantham House has provided the system with a reliable source of power. This will ensure that the lift is always able to return to the ground floor in the event of a fire or a mains failure.